Brands. Makers. Experiences.

A creative address in the heart of Al Quoz.

6,000 sqft of finished showroom, studio and café space behind Alserkal Avenue. Three zones, curated for brands that belong here — ready to occupy from 24 September 2026.

Showroom zones A · B · C Open for viewing now Curated, not open-listed
In residence

01 — The address

Why this address

Al Quoz 1 Cultural District, directly behind Alserkal Avenue — with roadside visibility on 19th Street.

21

Creative tenants in the compound

2

Guinness World Records set on site

8×

Creative-zone expansion under the Dubai 2040 Master Plan

33,000

Daily visitors projected for the district

Host venue for Dubai Culture’s Al Quoz Creative Entrepreneurship Forum 2026.

The Compound facade and signage at dusk
Gallery wall with artworks on metal grid panels above a fragrance display

02 — The building

Finished, not promised.

6,000 sqft across two levels — polished, cooled, lit and ready. Nothing here is a render.

Polished concrete floors

Exposed black steel mezzanine

Full-height glass entrance facing the road

Fully air-conditioned

Metal grid walls, floor to ceiling

Four renovated washrooms

All included in the fee No levies. No infrastructure contribution.

03 — Availability

Three zones. One building.

Take one zone, or take the whole building. Every zone is handed over clean and ready to occupy — not shell and core. Fit out as you like, or open as it stands.

A

Ground floor, double height

The first zone a visitor sees. Maximum visibility and impact.

821.30 sqft

Ground level

B

Ground floor, under the mezzanine

Its own roadside entrance with parking at the door. Connects to Zone C above by an internal stair.

778.21 sqft

Ground level

C

Mezzanine above Zone B

A private upper level — stock room, studio or extended display.

778.21 sqft

Mezzanine level

The whole building

Zones A + B + C, combined

2,377.72 sqft under one name, with a preferential rate for the combined package.

Enquire about rates

Rates are shared on enquiry. Every rate already includes the DREC fee and building services — no levies, no infrastructure contribution. 

05 — Programme

What happens in the building.

The foot traffic is programmed, not hoped for.

Daily

Studio shoots — fashion, corporate, weddings, brand campaigns

2–3 a month

Weekend pop-up markets

Twice a month

Networking evenings

On request

Private venue hire and brand activations

All day

Café at the entrance, plus Tao Media House social coverage for brands in the building

A pop-up market on the showroom floor beneath the steel mezzanine

06 — The entrance

The café keeps the door open all day.

Visitors arrive for coffee, and stay for the rooms behind it.

08 — How it works

From viewing to signed.

Four steps. Nothing binding until the last one.

01

You view the space

A walkthrough of the building and the zone you have in mind, by appointment. Bring your fit-out contractor if you have one.

02

You tell us you’re interested

An email naming the zone and your intended start date. We hold it for you while the paperwork is prepared.

03

We issue the agreement

A formal occupancy agreement drafted by a licensed UAE legal practitioner. Everything is signed and settled together — nothing else to pay.

04

You take the keys

Access from 24 September 2026. Fit out at your own pace, or open as the zone stands — power, lighting and cooling are already live.

Now

Finished and viewable

Weekdays and weekends, by appointment.

24 Sept 2026

Zones ready to occupy

Fit out at your own pace, or open as the zone stands.

Until taken

Held in order of commitment

Not order of enquiry. A zone is yours once it is confirmed in writing.

Once a zone is taken, it does not come back.